Preliminaries

  • Ensure your Building Regulation application has been lodged

  • Arrange necessary site and structural insurances

Health and Safety

  • Provide proper toilet facilities - ‘portaloos’ that are maintained weekly by the supplier are recommended

  • Ensure that members of the public are kept off your site by providing “Heras” temporary fencing or equivalent
    Storage

  • If you have no secure storage available, a lockable store for tools and
    equipment is worth considering


Entrance and Access

  • Hardcore may be needed for easy access to your site / crane hardstanding


Water and Electricity Supply

  • Water is essential: you may need a stopcock and standpipe or locate a
    temporary source by agreement with a neighbour or hire a bowser

  • Heavy duty tools need electricity: you may need to arrange for a temporary supply or hire a generator (you may also need a transformer for 110 volts)

Space Planning

  • Phase delivery of materials to avoid overcrowding the site

  • Also consider space for a skip

     

Copyright © 2006 : Potton Limited, Eltisley Road,Great Gransden, Sandy, Bedfordshire SG19 3AR : Tel. 01767 676 400 : email: contact@potton.co.uk

Privacy Policy