Site preparation
Preliminaries
- Ensure your Building Regulation application has been lodged
- Arrange necessary site and structural insurances
Health and Safety
- Provide proper toilet facilities - ‘portaloos’ that are maintained weekly by the supplier are recommended
- Ensure that members of the public are kept off your site by providing “Heras” temporary fencing or equivalent
Storage
- If you have no secure storage available, a lockable store for tools and equipment is worth considering
Entrance and Access
- Hardcore may be needed for easy access to your site / crane hardstanding
Water and Electricity Supply
- Water is essential: you may need a stopcock and standpipe or locate a temporary source by agreement with a neighbour or hire a bowser
- Heavy duty tools need electricity: you may need to arrange for a temporary supply or hire a generator (you may also need a transformer for 110 volts)
Space Planning
- Phase delivery of materials to avoid overcrowding the site
- Also consider space for a skip